Offistart - Virtual Offices, Office Space, Business Support Services
*Home>>>Commercial Space

What is the requirements for fire dampers in a HVAC system based on international building code?


Commercial space, 1250 square feet. HVAC system is entirely 8 and 6 inch insulated flex duct with galvanized steel diffusers. plenums, and tees. Ceilings are 10 feet high and the flex duct goes over the top of 4 walls that are steel studs and gypsum board. What, if any, are the requirements for fire dampers (how many, where at, etc.)?

Without actually seeing your office layout it is tough to say but the international code states that if a duct penetrates a fire corridor, and has an outlet on both sides of the firewall then a fire damper is required.

Note: Sheet metal duct work is rated at 1 hour so if you just penetrate the fire corridor but there is no diffuser then you will not need a fire damper as long as the duct is made of sheet metal.

This code is confusing and I have more information I have collected over the years if you want to email me.

If building is all non-combustible, fully sprinklered, most likely there is no need for fire dampers. Hopefully this system does not use above ceiling space as plenum, flex duct would not be allowed. If unit is in a mechanical room, it may need fire damper where plenum penetrates those walls...check approved plans.

Tags
  Rent Offices   Business Centers   Service Offices   Branch Offices   Temporary Offices   Shared Offices   Commercial Space   Office Space   Business Services   Business Address   Call Forwarding   Call Handling
Related information
  • Is renting out a classroom for workshops a good idea?

    That depends...is there a need for this type of space? Have you contacted potential renters to see if there is a need or interest. Have you done a survey of similar space available to see what it ...

  • Please advise me, I want to start my own business in Hyderabad.?

    kuthi sali randi,

    ...
  • What's the deal with the flat earth society? It's a joke right? They do believe the earth looks round?

    They are making a trek to the edge in the near future. They have a lot of rappelling equipment. They intend to go down as far as they can so they can debunk all the round earth believers. ...

  • Translate loft in spanish?

    Loft_= 脕tico, Desv谩n Basement/Cellar = S贸tano Now, for condos, in spanish we say Departamento tipo LOFT... (Loft-style apartment). So there's not really any other way to say it. Hope this...

  • In a lease agreement, what is the average number of months for advance deposit payment?

    Usually a depost of 1 to 3 months is customary, but you will have to ask other tenants in the area to truly get an idea of what is going on in the local market. If you have bad credit or a quest...

  • Space dementia...dior...midnight poison...ahhh?

    I.....I don't know what to say... lol

    ...
  • I need information on finding a commercial real estate agent to assist my husband?

    no worries, you can hire a buyers agent, and the get paid from the seller(leaser) so you do not have to pay them. Go to www.remax.com and look for an agent in your area, you will be happy you acqu...

  • Is a commercial lease much more expensive than a residential lease if they are in the same area?

    of course . commerciallly theres a possibility of earning a profit. therfore the leasee will want to more in rents. you cant even compare the two

    ...
  •  

    Categories--Copyright/IP Policy--Contact Webmaster